High frequency services and integrated timetables are central elements in public transport. High flexibility and frequency make rail services attractive compared to road and public bus services. The service frequency is necessary in metropolitan and dense populated areas, while timetables integration is suitable for rural areas.
The biggest challenge for the future is to implement high frequent services and integrated timetables despite the infrastructure limitations. The intra-modal competition in freight services can represent a threat for the Rail system. In some areas the infrastructure upgrade is vital. Integrated timetables place higher demands on the infrastructure and in the stations. It is also important to improve the infrastructure conditions, implementing advanced train operations and controlling systems.
Under the existing conditions, network limitations hinder the realisation of high frequent services. The optimisation of integrated timetabling is limited particularly in metropolitan areas where bottlenecks exist inside or near stations.