H24 T7 working cycle is used in the Rail industry for operational needs and for maintenance. This best practice must be increased to become pervasive.  Like in any other capital intense industry, Rail needs an organization capable of  maximizing  resources and investments.

H24 T7 working cycle extended application is needed for freight. Freight has no limitations in using night and week-end time windows. Service performances need to take advantage of reduced cycle time using buffers for the recovery of unexpected events. So there is a combined benefit of costs  and lead time reductions.
For the freight system the focal points are:

  • to use the residual rail track capacity along busy corridors and in metropolitan areas;
  • to minimize capacity investments in nodes where rail operations integrate into the maritime services and in hubs for efficient utilization of automated equipment.
  • to optimize the rolling stock turnaround allowing shorter cycle time  for any category of equipment.

While automation embedded in its design the concept of continuous working time with other traditional or semi-automated modules, it  requires  additional integration. The operational process redesign reduces non-productive time, allocating activities  all along the  productive chain in a way to exploit the infrastructure potential.