The capacity of hubs and nodes  for freight is developed in order to provide  rail services  according to the  co-modal mobility targets. The  nodes need to be compatible with  the  corridors’ capacity in order to  manage the desired throughput all along the lines.

The European rail network, connecting  industrial /commercial  traffic attraction zones, is a key factor for the rail freight systems success.  The easy accessibility  to the rail network applies to all production segments, Single Wagon Loads - SWL,  Blocked Train - BT and Container Load - according to  the respective traffic volumes.  Various forecast projections see  the combined  traffic  as the backbone of rail freight rejuvenation. Terminals and hubs  are the drivers for this development. It is very important to increase the  terminals handling capacity in order to be prepared for growth. Improved accessibility to intermodal transport and higher customer service performances  are needed to  penetrate new markets.

The key solution for intermodal traffic is the availability of a comprehensive European network of intermodal terminals, hubs and freight villages. These facilities are the access points to the system and can be clustered in Mega-hubs, standard terminals, freight villages and dry ports. Mega-hubs are high performance transfer stations positioned in the centre of  traffic basins and  corridors interchanges. They handle very high volumes of loading units. These facilities  act as consolidation canters for smaller satellite terminals offering  frequent direct services to national and international destinations. They  produce on a  24h working  cycle. The  Standard terminals are located inside or in the immediate vicinity of a metropolitan/urban areas. They offer direct services or via a Mega-hub. These terminals are connected to the seaports by frequent trains and fulfil simultaneously the function of hinterland dry ports close to the customers. Value added services are offered at the terminal site or in the adjacent freight village. The  freight villages  offer a multitude of  additional logistics activities. Freight villages are able to attract manufacturing or packaging  activities  for  those  wanting to achieve a “Zero Mile”  transport profile. Freight Villages  act  also as Dry Ports when  substantial  maritime traffic  flows  are  handled in their terminals.

The high demand for handling capacities in 2050 requires in  the European  traffic attraction zones, the completion of the terminal landscape. The realisation of these nodal infrastructures takes several years, from the initial  stages  up to completion. Construction planning is vital.
The  Nodes implementation  and  the corridors’ priorities go hand in hand with a number of other  actions  such as: ERMTS, seaports connections, by passes, bottlenecks elimination and  cross border interoperability constraints.