A loading gauge defines the maximum height and width for wagons. The gauge assures that the wagons with loaded vehicles can transit safely through bridges, tunnels and other rail infrastructures.
While the majority of railways in Europe use 1,435 mm standard gauge or 4 ft 8 1⁄2 inch, in other countries such as Spain or countries which territories used to be a part of the Russian Empire a broader gauge is used. For instance in Spain it is 1,668 mm known as Iberian gauge, while in Russia, Ukraine, Belarus, Finland, the Baltic countries the gauge width is 1,524 mm known as Russian gauge. The development of an integrated European HSR network is overcoming some of these differences. All HSR outside Russia, including those built in Spain and Portugal, use 1,435 mm standard gauge rail tracks. For conventional lines the replacement is considered too expensive and local solutions are used such as rolling stock able to adapt to the two gauges.
The alignment of the Core Network to Gauge C (4m high) helps modal shift for higher containers competing with road haulage. Higher gauges facilitate double decker passenger carriages. For conventional lines, the replacement is considered requiring too high investments.
The train length and axle loads are relevant topics for freight. In order to increase capacity at the European level, the trains are generally 750 m long, but efforts need to continue promoting the operation of longer trains, doubling their length up to 1,500 m. Such move helps the productivity increase of the existing rail lines improving the system performances by transporting more with the same resources.
The standardisation initiative of the axle load up to 22.5 tonnes is essential for loading trains to their maximum capacity introducing them into the network without facing problems from source to destination. These measures must go together with investments aimed at removing the network bottlenecks, increasing network capacity and interoperability. In conjunction with an increased tonnage, 20-25 % fewer train paths are required on the international corridors. While improvements of the permissible trains’ length and weight might be enforced, the doubling of the train length to 1,500 m requires actions such as the extension of overtaking tracks, the enhancement of the signalling systems and the nodes having coherent facilities for these trains. Only parts of these actions are in scope of the current TEN-T program.