The HSR investments account for the most significant amount of present and future Rail financial commitments. These investments are large, most of them already planned and partially funded. They have a “pulling” role for the railway ecosystem modernization, contributing  to the needed  capacity development.
The infrastructure investments are essential for the HSR development and for achieving  the shift to rail on the medium-long distances. For this reason one of the first EC goals is to triple the extension of the High Speed network by 2030. Modal shift targets are based on competitive service performances and  improved accessibility.
The HSR is tackling most of the problems of the overall rail system.
Leading examples are the European Governance and Interoperability:

  • The  HSR network is perceived by every country as a national market. The network has to be improved at European level for creating a single rail space.  This is necessary  for anticipating the “single rail area”.
  • The technical specifications and ERMTS are adopted on all the high speed lines  allowing to reach the target.
  • The HSR network is designed with  new components according to interoperability principles.

Most of the HSR investments have been already planned and large part of them are expected to be  completed in the period up to 2030.  Additional significant investments will  continue in the period after 2030. The “completion” of the HSR  planned network may require up to 40 years. Most of HSR lines to be realized up to 2030 have been designed. The successive expansion from 2030 up to 2050  is less defined.
The development of the HSR at the European level contributes to  resolve some of the traditional network bottlenecks. The completion of High Speed network is also important for the regional and medium distance passengers since long distance trains compete much less for capacity on traditional lines.